This Is A Gaoa Funded Project. The Facility At Roosevelt Harbor Includes A Concrete Abutment, Timber Pile Supported Acce
🔥 27/100This Is A Gaoa Funded Project. The Facility At Roosevelt Harbor Includes A Concrete Abutment, Timber Pile Supported Acce
SPX-081097
, Alaska
- Project ID
- SPX-081097
- Estimated value
- $166,781
- Square footage
- Not reported
- Opened / announced
- Sep 24, 2025
- Owner
- Department of Agriculture
- General contractor
- CARVER CONSTRUCTION, LLC
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
THIS IS A GAOA FUNDED PROJECT. THE FACILITY AT ROOSEVELT HARBOR INCLUDES A CONCRETE ABUTMENT, TIMBER PILE SUPPORTED ACCESS TRESTLE, GANGWAY, AND FLOATING DOCK. THE FLOATING DOCK IS CONSTRUCTED OF TWELVE 8 FT X 12 FT FOAM FILLED CONCRETE FLOATS CONNE. Awarded by Forest Service (Department of Agriculture). Period of performance through 2026-07-31.
Key specs
- Award 1240BJ25F0031
- Awarding agency: Forest Service
- ZIP 99929
Still open for manufacturers
Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
Timeline
Awarded
Sep 24, 2025 · Federal (SAM.gov / USAspending)
Priority score
Low signal27/100
- Value
- 24/40
- Recency
- 3/35
- News coverage
- 0/25
AK
Exact coordinates for this project haven't been geocoded yet.