For building product manufacturers and their rep agencies

See where your brand is specified, and where competitors are winning.

SpecIndex reads public bid documents in every state and shows your position in each spec: basis of design, approved equal, or absent, cited to the page.

Real public bid documents, not a demo. Takes up to 30 seconds.

A real result · Trane in Utah

One position, from the count back to the page.

Loading the live counts…
  1. 01
    The position
    Basis of design Trane, Heating, Ventilating, and Air Conditioning, Utah.
  2. 02
    The exact sentence
    “Basis of Design: Trane Packaged RTU and MAU equipment.”
    Under the heading “Air Handling Units” in the mechanical basis of design list.
  3. 03
    The page
    C04b Attachment 2 2025-07-11 USU PPRL Surg. CD Set_original.pdf, page 1. Project: Bldg. 56 upgrades at USDA ARS PPRL in Logan, UT (SPX-12032351). Citation verified 4 September 2026. Open the project
Who it is for

Built for manufacturers and the rep agencies that carry their lines.

Manufacturers

Where your brand stands in public bid documents, by division and state, cited to the page.

Brand page · live

Rep agencies

The open sections in your territory each week, with the substitution language and deadline where the document gives them.

Weekly digest · live

Your CRM and your agents

Every project and position as a record your systems can call: an API, and an MCP server.

API and MCP · live

Product and marketing teams

The performance language specs ask for where no brand is named.

In the brand page

Everyone

Every project page is free, public and permanent, with one SpecIndex ID.

Public index · live
Audiences we are still building for

Distributors

What is specified into your branch territory.

Coming

Investors and lenders

Whose spec share is moving, read from the public record.

Coming

Architects and engineers

Which products meet a spec, and who else has specified them.

Coming
The products

Three products on one cited index.

Brand Check

For the rep chasing projects, and anyone who needs one brand's standing today.

  • Reads

    The public specification documents we hold that name the brand, in the state you pick.

  • Returns

    Your standing in that state: how many basis of design positions, and how many approved equal listings.

  • Citation attached

    Every position names its document and the page the position was found on.

Brand Intelligence

For the manager planning territory.

  • Reads

    Your brand's positions across the states and divisions covered by the public specification documents we hold, plus the open specs in your divisions where no brand is named in them.

  • Returns

    Share by division and territory, competitor counts in aggregate, and a weekly digest of new positions and open specs in the divisions you follow.

  • Citation attached

    Every position links to its CSI division, the page, and the exact line in the public source.

Spec Check

For the rep working one project, who holds the spec book and needs to know where their brand stands in it before bid day.

  • Reads

    A project manual or spec section you upload, as a PDF or ZIP. Uploads are private to your account and never join the public corpus.

  • Returns

    The positions inside it: the manufacturers it names, the basis of design, the substitution posture and the deadlines, with the pages read counted.

  • Citation attached

    Every finding carries the page it came from in your own document.

How it works

Read. Classify. Cite.

Every position links to the document and the page it came from.

01 · READ

Public bid documents, January 2025 onward.

02 · CLASSIFY

Each section that names a brand becomes a position: basis of design, approved equal, or absent.

03 · CITE

On the page, by weekly digest, through the API, or to your AI agents.

Method: what is read, and what a count means

The documents are public solicitations, project manuals and addenda published by public agencies and procurement portals, fifty states, refreshed weekly. A position is a section of a specification that names a brand, classified as basis of design or approved equal. Counts describe the public bid documents SpecIndex has read. Privately bid work produces no public specification and is not represented. A zero means absent from these documents, not absent from the market.

The problem

The basis of design is written in a public document nobody on the sales team reads.

A listing is a price check. The basis of design is the job. If nobody reads the specification, the first sign of a lost one is an order that goes to somebody else.

What the index shows

How specs are written, counted from the specs.

7 to 1

Approved equal positions for every basis of design position: 4,216 against 622 in the sample. The design seat is the scarce one; most named positions are a place on a list around somebody else's design.

2

manufacturers on the approved list of the typical basis of design section, at the median. Half of basis of design sections name two or fewer.

Method and sample for these three figures

Not a survey and not an estimate. Measured on 13 October 2026 from every citable position the index returned for a panel of 15 national brands across the ten states where it holds the most documents: 4,838 positions in all, 622 of them basis of design, on 1,421 projects. The panel is a stated population, not the whole index, and counts describe the public bid documents SpecIndex has read; privately bid work produces no public specification and is not represented. Two candidate statistics that failed row level checking were dropped rather than published.

The index, live

The index, counted when the page loads.

The Spec Desk

The index, published.

The Spec Desk is SpecIndex's data publication: stories counted from the public bid documents in the index, every figure cited to the records behind it, and every article free in full.

Lead story
GSA P100 Carbon Baselines Require Division 01 Proof Before Technical Review

Federal civilian construction specifications require Division 01 administrative submittal proof to verify low embodied carbon compliance before engineering evaluation.

MasterFormat Division Layout Isolates Building Construction From Facility Services and Site Work

An overview of how CSI MasterFormat organizes project manuals into six functional subgroups and thirty five active divisions.

Building Code Authority and Division 01 Clauses Control Construction Material Substitutions

Model building code rules and MasterFormat Division 01 specifications require administrative proof and code official approval for product substitutions.

Every figure the Desk publishes states its population, its window and its method. How the Spec Desk computes its figures · All stories on the Spec Desk

Enterprise basics, stated plainly
Public sources only

Bid solicitations, project manuals and addenda published by public agencies and procurement portals. No private system is read.

Every position cited

Each position links back to the document it came from and the page it was found on, so any claim can be checked at the source.

Backed up daily

The production database is backed up automatically every day, with point in time recovery on.

What is not in place yet is listed on the security page in the same plain words. Read the security page

23 00 00 · HVAC · KING COUNTY
SEA Tower and S46 TRACON Mechanical Upgrades
"or approved equal", no basis namedSpec still open
23 81 00 · UNITARY HVAC · GRANT COUNTY
Columbia Basin Job Corps Center
Carrier 50TC · pp. 47 to 99Basis of design
08 41 13 · ALUMINUM FRAMED ENTRANCES
VA Puget Sound SCI Center, Seattle
Kawneer Trifab 451UTBasis of design
23 64 00 · CHILLERS · SPOKANE
Fairchild AFB Mission Support Group
Trane chillers · pp. 22 to 32Basis of design
Start here

Check your brand.

Pick a brand and a state. See each section that names it in the public specifications we hold, with the position and the page.

Run a brand check