The Purpose Of This Task Order Is To Design And Construct Water Distribution System Repairs For A Restricted Area At Ann
🔥 31/100← All projects
under constructionIndustrial
The Purpose Of This Task Order Is To Design And Construct Water Distribution System Repairs For A Restricted Area At Ann
SPX-088495
, Alabama
- Project ID
- SPX-088495
- Estimated value
- $4.7M
- Square footage
- Not reported
- Opened / announced
- Sep 26, 2024
- Owner
- Department of Defense
- General contractor
- SPEEGLE CONSTRUCTION, INC
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
THE PURPOSE OF THIS TASK ORDER IS TO DESIGN AND CONSTRUCT WATER DISTRIBUTION SYSTEM REPAIRS FOR A RESTRICTED AREA AT ANNISTON ARMY DEPOT, AL. Awarded by Department of the Army (Department of Defense). Period of performance through 2026-10-17.
Key specs
- Award W9127824F0327
- Awarding agency: Department of the Army
- ZIP 36201
Still open for manufacturers
Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.
Manufacturer watch list
- roofing
- hvac
- dock equipment
- concrete
- lighting
- fire suppression
Timeline
Awarded
Sep 26, 2024 · Federal (SAM.gov / USAspending)
Priority score
Low signal31/100
- Value
- 31/40
- Recency
- 0/35
- News coverage
- 0/25
📍 Regional location pending
AL
Exact coordinates for this project haven't been geocoded yet.