← All projects
under constructionData Center
Serverfarm ARK Clarksville Data Center Campus
Clarksville, Johnson County, Arkansas
- Estimated value
- $6.6B
- Square footage
- —
- Opened / announced
- Jul 20, 2026
- Owner
- Serverfarm
- General contractor
- —
- Architect
- —
- Brands mentioned
- Serverfarm
Project overview
Multi-building hyperscale data center campus near Johnson Regional Medical Center. Site prep and construction underway; first two buildings targeted January 2028. $558M projected local public benefit through 2060.
Key specs
- Multi-building scalable campus
- Advanced closed-loop cooling
- First phase by early 2028
- $548M PILOT payments projected
- Hundreds of construction jobs
Still open for manufacturers
Site prep active — power, cooling, and mission-critical MEP specs.
Manufacturer watch list
- generators
- switchgear
- cooling systems
- UPS
- security systems