Phase 3.2 Consist Of The Construction Of 14,665 Lf Of Irrigation Canal, 8 Farm Offtakes, 5 Siphon Structures, 1 Gravity
🔥 42/100← All projects
under constructionCommercial
Phase 3.2 Consist Of The Construction Of 14,665 Lf Of Irrigation Canal, 8 Farm Offtakes, 5 Siphon Structures, 1 Gravity
SPX-079560
, Arkansas
- Project ID
- SPX-079560
- Estimated value
- $24.6M
- Square footage
- Not reported
- Opened / announced
- Jan 15, 2026
- Owner
- Department of Defense
- General contractor
- RIGID CONSTRUCTORS LLC
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
PHASE 3.2 CONSIST OF THE CONSTRUCTION OF 14,665 LF OF IRRIGATION CANAL, 8 FARM OFFTAKES, 5 SIPHON STRUCTURES, 1 GRAVITY TURNOUT, 2 PUMP TURNOUTS, AND ASSOCIATED GRADING AND DRAINAGE. Awarded by Department of the Army (Department of Defense). Period of performance through 2028-03-16.
Key specs
- Award W912EQ26CA004
- Awarding agency: Department of the Army
- ZIP 72142
Still open for manufacturers
Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
Timeline
Awarded
Jan 15, 2026 · Federal (SAM.gov / USAspending)
Priority score
Watch42/100
- Value
- 34/40
- Recency
- 8/35
- News coverage
- 0/25
📍 Regional location pending
AR
Exact coordinates for this project haven't been geocoded yet.