under constructionData Center
Prime Data Centers PHX01 Avondale Campus
Avondale, Maricopa County, Arizona
- Estimated value
- $3B
- Square footage
- 1,300,000 SF
- Opened / announced
- May 21, 2026
- Owner
- Prime Data Centers
- General contractor
- ARCO/Murray
- Architect
- —
- Brands mentioned
- Prime Data Centers, SRP, ARCO/Murray
Project overview
Five-building 240MW hyperscale campus on 66.5 acres in Avondale. Ground broken on first three 267,000 SF buildings (48MW each); on-site 250MW SRP substation commissioned for first 144MW.
Key specs
- 240MW total IT load
- 1.3M SF across 5 buildings
- 48MW per building
- Closed-loop cooling
- 20 data halls
- Hyperscaler leased Buildings 1–3
Still open for manufacturers
Active hyperscale build — MEP, power, and cooling packages for Buildings 1–3.
Manufacturer watch list
- switchgear
- generators
- cooling systems
- UPS
- fire suppression