The Purpose Of This Contract Will Be To Provide Design-Build Construction Services For The Approximate 20-Mile Primary B
🔥 40/100The Purpose Of This Contract Will Be To Provide Design-Build Construction Services For The Approximate 20-Mile Primary B
SPX-082260
, Arizona
- Project ID
- SPX-082260
- Estimated value
- $180.8M
- Square footage
- Not reported
- Opened / announced
- Aug 18, 2025
- Owner
- Department of Defense. Department of Veterans Affairs
- General contractor
- BFBC LLC. SUN EAGLE CORP
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
THE PURPOSE OF THIS CONTRACT WILL BE TO PROVIDE DESIGN-BUILD CONSTRUCTION SERVICES FOR THE APPROXIMATE 20-MILE PRIMARY BARRIER REPLACEMENT PROJECT ON THE BARRY M. GOLDWATER RANGE BMGR IN THE U.S. BORDER PATROLS YUMA SECTOR IN ARIZONA. Awarded by Department of the Army (Department of Defense). Period of performance through 2026-08-17. DESIGN BUILD CONSTRUCTION. Awarded by Department of Veterans Affairs. Period of performance through 2024-09-30.
Key specs
- Award W912PL25CA004
- Awarding agency: Department of the Army
- ZIP 85364
- Award 36C10F18C3394
- Awarding agency: Department of Veterans Affairs
- ZIP 85001
Still open for manufacturers
Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests. Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
Timeline
Awarded
Aug 18, 2025 · Federal (SAM.gov / USAspending)
Priority score
Watch40/100
- Value
- 38/40
- Recency
- 2/35
- News coverage
- 0/25
AZ
Exact coordinates for this project haven't been geocoded yet.