← All projects
planningData Center
Prologis Silver Creek Valley Data Center
San Jose, Santa Clara County, California
- Estimated value
- Undisclosed
- Square footage
- 516,000 SF
- Opened / announced
- Jul 9, 2026
- Owner
- Prologis
- General contractor
- —
- Architect
- —
- Brands mentioned
- Prologis
Project overview
Three-story 516,000 SF data center with 99MW capacity and on-site substation at 5977 Silver Creek Valley Road. Converted from previously entitled industrial warehouse site.
Key specs
- 99MW capacity
- 516,000 SF
- 15-acre site
- On-site substation
- ~2-year construction timeline
- Prologis covering transmission upgrade costs
Still open for manufacturers
Permit filed — early procurement for power and MEP infrastructure.
Manufacturer watch list
- switchgear
- generators
- cooling
- substation equipment
- structured cabling