This Project Is To Use Engineering And Feasibility Studies Performed Post Construction For The Chilled Water And Mbr/Rec
🔥 29/100This Project Is To Use Engineering And Feasibility Studies Performed Post Construction For The Chilled Water And Mbr/Rec
SPX-089695
, California
- Project ID
- SPX-089695
- Estimated value
- $1.7M
- Square footage
- Not reported
- Opened / announced
- Aug 30, 2024
- Owner
- General Services Administration
- General contractor
- KCORP RELIANCE COMPANY, INC.
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
THIS PROJECT IS TO USE ENGINEERING AND FEASIBILITY STUDIES PERFORMED POST CONSTRUCTION FOR THE CHILLED WATER AND MBR/RECLAIMED WATER SYSTEMS TO CORRECT PREVIOUS DESIGNS, SO THAT EACH SYSTEM CAN FULLY SERVICE AND SUPPORT SAN YSIDRO LPOE, SAN YSIDRO CA. Awarded by Public Buildings Service (General Services Administration). Period of performance through 2026-11-20.
Key specs
- Award 47PK0724C0022
- Awarding agency: Public Buildings Service
- ZIP 92173
Still open for manufacturers
Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
Timeline
Awarded
Aug 30, 2024 · Federal (SAM.gov / USAspending)
Priority score
Low signal29/100
- Value
- 29/40
- Recency
- 0/35
- News coverage
- 0/25
CA
Exact coordinates for this project haven't been geocoded yet.