Award Of Task Order For The Design And Construction Of The Phase 2 Low Rise Elevator Modernization Project Located At 45
🔥 30/100Award Of Task Order For The Design And Construction Of The Phase 2 Low Rise Elevator Modernization Project Located At 45
SPX-092102
, California
- Project ID
- SPX-092102
- Estimated value
- $2.7M
- Square footage
- Not reported
- Opened / announced
- Oct 20, 2023
- Owner
- General Services Administration
- General contractor
- SEA PAC ENGINEERING INC
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
AWARD OF TASK ORDER FOR THE DESIGN AND CONSTRUCTION OF THE PHASE 2 LOW RISE ELEVATOR MODERNIZATION PROJECT LOCATED AT 450 GOLDEN GATE AVE, SAN FRANCISCO, CA 94102. THE PERIOD OF PERFORMANCE IS 520 CD AFTER ISSUANCE OF THE NOTICE TO PROCEED. Awarded by Public Buildings Service (General Services Administration). Period of performance through 2026-01-29.
Key specs
- Award 47PK1724F0006
- Awarding agency: Public Buildings Service
- ZIP 94102
Still open for manufacturers
Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
Timeline
Awarded
Oct 20, 2023 · Federal (SAM.gov / USAspending)
Priority score
Low signal30/100
- Value
- 30/40
- Recency
- 0/35
- News coverage
- 0/25
CA
Exact coordinates for this project haven't been geocoded yet.