Award Of Task Order For The Design And Construction Of The Phase 2 Low Rise Elevator Modernization Project Located At 45

🔥 30/100
← All projects
completedCommercial

Award Of Task Order For The Design And Construction Of The Phase 2 Low Rise Elevator Modernization Project Located At 45

SPX-092102

, California

Project ID
SPX-092102
Estimated value
$2.7M
Square footage
Not reported
Opened / announced
Oct 20, 2023
Owner
General Services Administration
General contractor
SEA PAC ENGINEERING INC
Architect
Not reported
Brands mentioned
None in public seed

Project overview

AWARD OF TASK ORDER FOR THE DESIGN AND CONSTRUCTION OF THE PHASE 2 LOW RISE ELEVATOR MODERNIZATION PROJECT LOCATED AT 450 GOLDEN GATE AVE, SAN FRANCISCO, CA 94102. THE PERIOD OF PERFORMANCE IS 520 CD AFTER ISSUANCE OF THE NOTICE TO PROCEED. Awarded by Public Buildings Service (General Services Administration). Period of performance through 2026-01-29.

Key specs

  • Award 47PK1724F0006
  • Awarding agency: Public Buildings Service
  • ZIP 94102

Still open for manufacturers

Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete

Timeline

  1. Awarded

    Oct 20, 2023 · Federal (SAM.gov / USAspending)

Priority score

Low signal

30/100

Value
30/40
Recency
0/35
News coverage
0/25
📍 Regional location pending

CA

Exact coordinates for this project haven't been geocoded yet.