Design And Build A New Water Supply Line Between The City Of Petaluma Water Distribution System And Uscg Tracens Water P
🔥 39/100← All projects
under constructionIndustrial
Design And Build A New Water Supply Line Between The City Of Petaluma Water Distribution System And Uscg Tracens Water P
SPX-079771
, California
- Project ID
- SPX-079771
- Estimated value
- $16.0M
- Square footage
- Not reported
- Opened / announced
- Dec 22, 2025
- Owner
- Department of Homeland Security
- General contractor
- J. I. GARCIA CONSTRUCTION, INC.
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
DESIGN AND BUILD A NEW WATER SUPPLY LINE BETWEEN THE CITY OF PETALUMA WATER DISTRIBUTION SYSTEM AND USCG TRACENS WATER PUMP STATION AT KING ROAD AND BODEGA AVE. Awarded by U.S. Coast Guard (Department of Homeland Security). Period of performance through 2027-07-17.
Key specs
- Award 70Z05026F43000004
- Awarding agency: U.S. Coast Guard
- ZIP 94952
Still open for manufacturers
Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.
Manufacturer watch list
- roofing
- hvac
- dock equipment
- concrete
- lighting
- fire suppression
Timeline
Awarded
Dec 22, 2025 · Federal (SAM.gov / USAspending)
Priority score
Low signal39/100
- Value
- 33/40
- Recency
- 6/35
- News coverage
- 0/25
📍 Regional location pending
CA
Exact coordinates for this project haven't been geocoded yet.