Design And Build A New Water Supply Line Between The City Of Petaluma Water Distribution System And Uscg Tracens Water P

🔥 39/100
← All projects
under constructionIndustrial

Design And Build A New Water Supply Line Between The City Of Petaluma Water Distribution System And Uscg Tracens Water P

SPX-079771

, California

Project ID
SPX-079771
Estimated value
$16.0M
Square footage
Not reported
Opened / announced
Dec 22, 2025
Owner
Department of Homeland Security
General contractor
J. I. GARCIA CONSTRUCTION, INC.
Architect
Not reported
Brands mentioned
None in public seed

Project overview

DESIGN AND BUILD A NEW WATER SUPPLY LINE BETWEEN THE CITY OF PETALUMA WATER DISTRIBUTION SYSTEM AND USCG TRACENS WATER PUMP STATION AT KING ROAD AND BODEGA AVE. Awarded by U.S. Coast Guard (Department of Homeland Security). Period of performance through 2027-07-17.

Key specs

  • Award 70Z05026F43000004
  • Awarding agency: U.S. Coast Guard
  • ZIP 94952

Still open for manufacturers

Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.

Manufacturer watch list

  • roofing
  • hvac
  • dock equipment
  • concrete
  • lighting
  • fire suppression

Timeline

  1. Awarded

    Dec 22, 2025 · Federal (SAM.gov / USAspending)

Priority score

Low signal

39/100

Value
33/40
Recency
6/35
News coverage
0/25
📍 Regional location pending

CA

Exact coordinates for this project haven't been geocoded yet.