Construction: Install New Pipe And Conduct Repairs To Existing Waterline Pipeline On Beale Afb Iaw The Sow V2 Dated 12 M
🔥 29/100Construction: Install New Pipe And Conduct Repairs To Existing Waterline Pipeline On Beale Afb Iaw The Sow V2 Dated 12 M
SPX-090430
, California
- Project ID
- SPX-090430
- Estimated value
- $1.6M
- Square footage
- Not reported
- Opened / announced
- Aug 8, 2024
- Owner
- Department of Defense
- General contractor
- ABC BCS JV
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
CONSTRUCTION: INSTALL NEW PIPE AND CONDUCT REPAIRS TO EXISTING WATERLINE PIPELINE ON BEALE AFB IAW THE SOW V2 DATED 12 MAR 2024. SEE ATTACHED OPTION SON - BASE POOL STORM DRAIN REPAIRS DATED 23 FEB 2024. Awarded by Department of the Air Force (Department of Defense). Period of performance through 2025-06-04.
Key specs
- Award FA468624C0012
- Awarding agency: Department of the Air Force
- ZIP 95903
Still open for manufacturers
Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
Timeline
Awarded
Aug 8, 2024 · Federal (SAM.gov / USAspending)
Priority score
Low signal29/100
- Value
- 29/40
- Recency
- 0/35
- News coverage
- 0/25
CA
Exact coordinates for this project haven't been geocoded yet.