Phase 2B Marysville Levee Efforts To Strengthen The Levee By Addition Of The Seepage Cutoff Wall And Include Constructio
🔥 33/100← All projects
completedCommercial
Phase 2B Marysville Levee Efforts To Strengthen The Levee By Addition Of The Seepage Cutoff Wall And Include Constructio
SPX-093447
, California
- Project ID
- SPX-093447
- Estimated value
- $17.5M
- Square footage
- Not reported
- Opened / announced
- Mar 27, 2023
- Owner
- Department of Defense
- General contractor
- NSOD JOINT VENTURE
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
PHASE 2B MARYSVILLE LEVEE EFFORTS TO STRENGTHEN THE LEVEE BY ADDITION OF THE SEEPAGE CUTOFF WALL AND INCLUDE CONSTRUCTION OF SEEPAGE BERMS. Awarded by Department of the Army (Department of Defense). Period of performance through 2025-03-30.
Key specs
- Award W9123823C0009
- Awarding agency: Department of the Army
- ZIP 95901
Still open for manufacturers
Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
Timeline
Awarded
Mar 27, 2023 · Federal (SAM.gov / USAspending)
Priority score
Low signal33/100
- Value
- 33/40
- Recency
- 0/35
- News coverage
- 0/25
📍 Regional location pending
CA
Exact coordinates for this project haven't been geocoded yet.