Phase 2B Marysville Levee Efforts To Strengthen The Levee By Addition Of The Seepage Cutoff Wall And Include Constructio

🔥 33/100
← All projects
completedCommercial

Phase 2B Marysville Levee Efforts To Strengthen The Levee By Addition Of The Seepage Cutoff Wall And Include Constructio

SPX-093447

, California

Project ID
SPX-093447
Estimated value
$17.5M
Square footage
Not reported
Opened / announced
Mar 27, 2023
Owner
Department of Defense
General contractor
NSOD JOINT VENTURE
Architect
Not reported
Brands mentioned
None in public seed

Project overview

PHASE 2B MARYSVILLE LEVEE EFFORTS TO STRENGTHEN THE LEVEE BY ADDITION OF THE SEEPAGE CUTOFF WALL AND INCLUDE CONSTRUCTION OF SEEPAGE BERMS. Awarded by Department of the Army (Department of Defense). Period of performance through 2025-03-30.

Key specs

  • Award W9123823C0009
  • Awarding agency: Department of the Army
  • ZIP 95901

Still open for manufacturers

Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete

Timeline

  1. Awarded

    Mar 27, 2023 · Federal (SAM.gov / USAspending)

Priority score

Low signal

33/100

Value
33/40
Recency
0/35
News coverage
0/25
📍 Regional location pending

CA

Exact coordinates for this project haven't been geocoded yet.