The Sacramento Weir Widening Will Reduce Water Surface Elevation In Sacramento River And Allow Water To Flow Into The Yo

🔥 38/100
← All projects
under constructionCommercial

The Sacramento Weir Widening Will Reduce Water Surface Elevation In Sacramento River And Allow Water To Flow Into The Yo

SPX-093250

, California

Project ID
SPX-093250
Estimated value
$187.9M
Square footage
Not reported
Opened / announced
Jun 1, 2023
Owner
Department of Defense
General contractor
GRANITE CONSTRUCTION COMPANY
Architect
Not reported
Brands mentioned
None in public seed

Project overview

THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. Awarded by Department of the Army (Department of Defense). Period of performance through 2026-12-02.

Key specs

  • Award W9123823C0014
  • Awarding agency: Department of the Army
  • ZIP 95605

Still open for manufacturers

Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete

Timeline

  1. Awarded

    Jun 1, 2023 · Federal (SAM.gov / USAspending)

Priority score

Low signal

38/100

Value
38/40
Recency
0/35
News coverage
0/25
📍 Regional location pending

CA

Exact coordinates for this project haven't been geocoded yet.