INSTALLING SHINGLES FIRST COURSE Start with full shingle, which MUST be nailed on lower nail zone line. Shingle exposure
🔥 21/100INSTALLING SHINGLES FIRST COURSE Start with full shingle, which MUST be nailed on lower nail zone line. Shingle exposure
SPX-143915
Hartford, Hartford County, Connecticut
- Project ID
- SPX-143915
- Estimated value
- $18,474
- Square footage
- Not reported
- Opened / announced
- Feb 10, 2025
- Owner
- Not reported
- General contractor
- Not reported
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
Hartford commercial permit COM-ALT-25-000081 (Commercial Alteration Permit): INSTALLING SHINGLES FIRST COURSE Start with full shingle, which MUST be nailed on lower nail zone line. Shingle exposure should be 5 5/8" (143 mm). SECOND COURSE Position the shingles in the second and subsequent courses flush with the tops of the wide cut-outs. This results in a 5 5/8" (143 mm) exposure. THIRD COURSE Trim 11" (279 mm) from rake end of first shingle. FOURTH COURSE AND REMAINING Strike a chalk line about every 6 courses to check parallel alignment with eaves. Trim 17" (432 mm) from rake end of first shingle. Continue with whole shingles. Repeat the 1st to 4th course instructions on the remaining courses, starting the fifth course with a full shingle. 168 VID ST, HARTFORD, TC 06112. Hartford commercial permit COM-ALT-25-000283 (Commercial Alteration Permit): INSTALLING SHINGLES FIRST COURSE Start with full shingle, which MUST be nailed on lower nail zone line. Shingle exposure should be 5 5/8" (143 mm). SECOND COURSE Position the shingles in the second and subsequent courses flush with the tops of the wide cut-outs. This results in a 5 5/8" (143 mm) exposure. THIRD COURSE Trim 11" (279 mm) from rake end of first shingle. FOURTH COURSE AND REMAINING Strike a chalk line about every 6 courses to check parallel alignment with eaves. Trim 17" (432 mm) from rake end of first shingle. Continue with whole shingles. Repeat the 1st to 4th course instructions on the remaining courses, starting the fifth course with a full shingle. 55 COLONIAL ST, HARTFORD, CT 06106. Hartford commercial permit COM-ALT-25-000438 (Commercial Alteration Permit): INSTALLING SHINGLES FIRST COURSE Start with full shingle, which MUST be nailed on lower nail zone line. Shingle exposure should be 5 5/8" (143 mm). SECOND COURSE Position the shingles in the second and subsequent courses flush with the tops of the wide cut-outs. This results in a 5 5/8" (143 mm) exposure. THIRD COURSE Trim 11" (279 mm) from rake end of first shingle. FOURTH COURSE AND REMAINING Strike a chalk line about every 6 courses to check parallel alignment with eaves. Trim 17" (432 mm) from rake end of first shingle. Continue with whole shingles. Repeat the 1st to 4th course instructions on the remaining courses, starting the fifth course with a full shingle.. 17 MC KINLEY ST, HARTFORD, CT 06114. Hartford commercial permit COM-ALT-25-000482 (Commercial Alteration Permit): INSTALLING SHINGLES FIRST COURSE Start with full shingle, which MUST be nailed on lower nail zone line. Shingle exposure should be 5 5/8" (143 mm). SECOND COURSE Position the shingles in the second and subsequent courses flush with the tops of the wide cut-outs. This results in a 5 5/8" (143 mm) exposure. THIRD COURSE Trim 11" (279 mm) from rake end of first shingle. FOURTH COURSE AND REMAINING Strike a chalk line about every 6 courses to check parallel alignment with eaves. Trim 17" (432 mm) from rake end of first shingle. Continue with whole shingles. Repeat the 1st to 4th course instructions on the remaining courses, starting the fifth course with a full shingle.. 459 EDGEWOOD ST, HARTFORD, CT 06112.
Key specs
- Commercial Alteration Permit
- 168 VID ST, HARTFORD, TC 06112
- Permit COM-ALT-25-000081
- 55 COLONIAL ST, HARTFORD, CT 06106
- Permit COM-ALT-25-000283
- 17 MC KINLEY ST, HARTFORD, CT 06114
- Permit COM-ALT-25-000438
- 459 EDGEWOOD ST, HARTFORD, CT 06112
- Permit COM-ALT-25-000482
Still open for manufacturers
Active commercial building permit. Early product/spec window.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
- fire suppression
Timeline
Permit issued
Feb 10, 2025 · Prior research
Priority score
Low signal21/100
- Value
- 20/40
- Recency
- 1/35
- News coverage
- 0/25
Hartford, Hartford County, CT
Exact coordinates for this project haven't been geocoded yet.