INSTALLING SHINGLES FIRST COURSE Start with full shingle, which MUST be nailed on lower nail zone line. Shingle exposure

🔥 21/100
← All projects
permittingCommercial

INSTALLING SHINGLES FIRST COURSE Start with full shingle, which MUST be nailed on lower nail zone line. Shingle exposure

SPX-143915

Hartford, Hartford County, Connecticut

Project ID
SPX-143915
Estimated value
$18,474
Square footage
Not reported
Opened / announced
Feb 10, 2025
Owner
Not reported
General contractor
Not reported
Architect
Not reported
Brands mentioned
None in public seed

Project overview

Hartford commercial permit COM-ALT-25-000081 (Commercial Alteration Permit): INSTALLING SHINGLES FIRST COURSE Start with full shingle, which MUST be nailed on lower nail zone line. Shingle exposure should be 5 5/8" (143 mm). SECOND COURSE Position the shingles in the second and subsequent courses flush with the tops of the wide cut-outs. This results in a 5 5/8" (143 mm) exposure. THIRD COURSE  Trim 11" (279 mm) from rake end of first shingle. FOURTH COURSE AND REMAINING Strike a chalk line about every 6 courses to check parallel alignment with eaves. Trim 17" (432 mm) from rake end of first shingle. Continue with whole shingles. Repeat the 1st to 4th course instructions on the remaining courses, starting the fifth course with a full shingle. 168 VID ST, HARTFORD, TC 06112. Hartford commercial permit COM-ALT-25-000283 (Commercial Alteration Permit): INSTALLING SHINGLES FIRST COURSE Start with full shingle, which MUST be nailed on lower nail zone line. Shingle exposure should be 5 5/8" (143 mm). SECOND COURSE Position the shingles in the second and subsequent courses flush with the tops of the wide cut-outs. This results in a 5 5/8" (143 mm) exposure. THIRD COURSE  Trim 11" (279 mm) from rake end of first shingle. FOURTH COURSE AND REMAINING Strike a chalk line about every 6 courses to check parallel alignment with eaves. Trim 17" (432 mm) from rake end of first shingle. Continue with whole shingles. Repeat the 1st to 4th course instructions on the remaining courses, starting the fifth course with a full shingle. 55 COLONIAL ST, HARTFORD, CT 06106. Hartford commercial permit COM-ALT-25-000438 (Commercial Alteration Permit): INSTALLING SHINGLES FIRST COURSE  Start with full shingle, which MUST be nailed on lower nail zone line. Shingle exposure should be 5 5/8" (143 mm). SECOND COURSE Position the shingles in the second and subsequent courses flush with the tops of the wide cut-outs. This results in a 5 5/8" (143 mm) exposure. THIRD COURSE  Trim 11" (279 mm) from rake end of first shingle. FOURTH COURSE AND REMAINING Strike a chalk line about every 6 courses to check parallel alignment with eaves. Trim 17" (432 mm) from rake end of first shingle. Continue with whole shingles. Repeat the 1st to 4th course instructions on the remaining courses, starting the fifth course with a full shingle.. 17 MC KINLEY ST, HARTFORD, CT 06114. Hartford commercial permit COM-ALT-25-000482 (Commercial Alteration Permit): INSTALLING SHINGLES FIRST COURSE Start with full shingle, which MUST be nailed on lower nail zone line. Shingle exposure should be 5 5/8" (143 mm). SECOND COURSE Position the shingles in the second and subsequent courses flush with the tops of the wide cut-outs. This results in a 5 5/8" (143 mm) exposure. THIRD COURSE  Trim 11" (279 mm) from rake end of first shingle. FOURTH COURSE AND REMAINING Strike a chalk line about every 6 courses to check parallel alignment with eaves. Trim 17" (432 mm) from rake end of first shingle. Continue with whole shingles. Repeat the 1st to 4th course instructions on the remaining courses, starting the fifth course with a full shingle.. 459 EDGEWOOD ST, HARTFORD, CT 06112.

Key specs

  • Commercial Alteration Permit
  • 168 VID ST, HARTFORD, TC 06112
  • Permit COM-ALT-25-000081
  • 55 COLONIAL ST, HARTFORD, CT 06106
  • Permit COM-ALT-25-000283
  • 17 MC KINLEY ST, HARTFORD, CT 06114
  • Permit COM-ALT-25-000438
  • 459 EDGEWOOD ST, HARTFORD, CT 06112
  • Permit COM-ALT-25-000482

Still open for manufacturers

Active commercial building permit. Early product/spec window.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete
  • fire suppression

Timeline

  1. Permit issued

    Feb 10, 2025 · Prior research

Priority score

Low signal

21/100

Value
20/40
Recency
1/35
News coverage
0/25
📍 Regional location pending

Hartford, Hartford County, CT

Exact coordinates for this project haven't been geocoded yet.