Hand separation then machine demolition, removal, & disposal of a 39'x45' (1755 SF) 2-walled metal canopy addition from
🔥 23/100Hand separation then machine demolition, removal, & disposal of a 39'x45' (1755 SF) 2-walled metal canopy addition from
SPX-131167
Hartford, Hartford County, Connecticut
- Project ID
- SPX-131167
- Estimated value
- $6,210
- Square footage
- Not reported
- Opened / announced
- Dec 15, 2025
- Owner
- Not reported
- General contractor
- Not reported
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
Hartford commercial permit COM-ALT-25-000568 (Commercial Alteration Permit): Hand separation then machine demolition, removal, & disposal of a 39'x45' (1755 SF) 2-walled metal canopy addition from the rear (C-side) of 116 Ledyard Street, a slab-on-grade 1-story commercial building. Leave disturbed areas rough graded with onsite soils. Use water for dust control via onsite source. Live load all debris onto our dump trailers or triaxles. Truck and dispose all debris to licensed facilities. There are no utilities in or attached to the section we will remove.. 116 LEDYARD ST, HARTFORD, CT 06114.
Key specs
- Commercial Alteration Permit
- 116 LEDYARD ST, HARTFORD, CT 06114
- Permit COM-ALT-25-000568
Still open for manufacturers
Active commercial building permit. Early product/spec window.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
- fire suppression
Timeline
Permit issued
Dec 15, 2025 · Prior research
Priority score
Low signal23/100
- Value
- 17/40
- Recency
- 6/35
- News coverage
- 0/25
Hartford, Hartford County, CT
Exact coordinates for this project haven't been geocoded yet.