Hand separation then machine demolition, removal, & disposal of a 39'x45' (1755 SF) 2-walled metal canopy addition from

🔥 23/100
← All projects
permittingCommercial

Hand separation then machine demolition, removal, & disposal of a 39'x45' (1755 SF) 2-walled metal canopy addition from

SPX-131167

Hartford, Hartford County, Connecticut

Project ID
SPX-131167
Estimated value
$6,210
Square footage
Not reported
Opened / announced
Dec 15, 2025
Owner
Not reported
General contractor
Not reported
Architect
Not reported
Brands mentioned
None in public seed

Project overview

Hartford commercial permit COM-ALT-25-000568 (Commercial Alteration Permit): Hand separation then machine demolition, removal, & disposal of a 39'x45' (1755 SF) 2-walled metal canopy addition from the rear (C-side) of 116 Ledyard Street, a slab-on-grade 1-story commercial building. Leave disturbed areas rough graded with onsite soils. Use water for dust control via onsite source. Live load all debris onto our dump trailers or triaxles. Truck and dispose all debris to licensed facilities. There are no utilities in or attached to the section we will remove.. 116 LEDYARD ST, HARTFORD, CT 06114.

Key specs

  • Commercial Alteration Permit
  • 116 LEDYARD ST, HARTFORD, CT 06114
  • Permit COM-ALT-25-000568

Still open for manufacturers

Active commercial building permit. Early product/spec window.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete
  • fire suppression

Timeline

  1. Permit issued

    Dec 15, 2025 · Prior research

Priority score

Low signal

23/100

Value
17/40
Recency
6/35
News coverage
0/25
📍 Regional location pending

Hartford, Hartford County, CT

Exact coordinates for this project haven't been geocoded yet.