Install new 15A lighting circuit up thru bathroom upper wall junction and thru kitchen ceiling area. Install new 20A c
🔥 21/100Install new 15A lighting circuit up thru bathroom upper wall junction and thru kitchen ceiling area. Install new 20A c
SPX-133098
Hartford, Hartford County, Connecticut
- Project ID
- SPX-133098
- Estimated value
- $4,230
- Square footage
- Not reported
- Opened / announced
- Oct 14, 2025
- Owner
- Not reported
- General contractor
- Not reported
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
Hartford commercial permit MISC-ELC-25-001005 (Electrical Permit): Install new 15A lighting circuit up thru bathroom upper wall junction and thru kitchen ceiling area. Install new 20A circuit to junction box in kitchen stove wall for microwave and convenience outlet. Install new 20A circuit with 2 junction boxes with 2 new receptacles in kitchen sink wall. Install new 20A circuit from basement 2nd flr load center to bathroom Remove power on old K&T circuits used on 2nd floor kitchen ceiling, bedroom ceiling fan, bathroom plug and lights. Break apart and refeed with new circuits run from basement load center. Third floor knob and tube old wiring removed from second floor pass thru and junctioned into small wall in 3rd flr bathroom for future renovation. Install new circuit from 3rd flr load center in basement load center to K&T junction on 2nd floor 2 circuit load center feeding 3rd floor.REF: COM-ALT-25-000461. 62 ROWE AV, HARTFORD, CT 06106.
Key specs
- Electrical Permit
- 62 ROWE AV, HARTFORD, CT 06106
- Permit MISC-ELC-25-001005
Still open for manufacturers
Active commercial building permit. Early product/spec window.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
- fire suppression
Timeline
Permit issued
Oct 14, 2025 · Prior research
Priority score
Low signal21/100
- Value
- 17/40
- Recency
- 4/35
- News coverage
- 0/25
Hartford, Hartford County, CT
Exact coordinates for this project haven't been geocoded yet.