The existing building all three floors have a pipe schedule ordinary hazard fire sprinkler system. The existing sprinkle
🔥 22/100The existing building all three floors have a pipe schedule ordinary hazard fire sprinkler system. The existing sprinkle
SPX-140149
Hartford, Hartford County, Connecticut
- Project ID
- SPX-140149
- Estimated value
- $32,000
- Square footage
- Not reported
- Opened / announced
- May 15, 2025
- Owner
- Not reported
- General contractor
- Not reported
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
Hartford commercial permit MISC-FIRSU-25-000008 (Fire Suppression Permit): The existing building all three floors have a pipe schedule ordinary hazard fire sprinkler system. The existing sprinkler piping on the second and third floors are not active because there is no heat on these floors. A 4" dry pipe valve, control valve with tamper switch, air compressor, low air pressure switch, and alarm pressure switch will be installed to connect to the second and third floor risers located on the first floor. No sprinkler piping modifications or replacements of sprinkler heads are required. Electrical wiring of the air compressor, valve tamper switches, alarm switches will be performed by Fire alarm specialty design (FASD) via a separate permit that they will file. CONDITION: test most remote area. a pressure test and trip test for the valve on completion. alarm panel tie in / monitoring.. 20 CHESTNUT ST, HARTFORD, CT 06120.
Key specs
- Fire Suppression Permit
- 20 CHESTNUT ST, HARTFORD, CT 06120
- Permit MISC-FIRSU-25-000008
Still open for manufacturers
Active commercial building permit. Early product/spec window.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
- fire suppression
Timeline
Permit issued
May 15, 2025 · Prior research
Priority score
Low signal22/100
- Value
- 21/40
- Recency
- 1/35
- News coverage
- 0/25
Hartford, Hartford County, CT