Perform code required 12-year hydrostatic test and recharge on (1) fire suppression cylinder: (1) Kiddie WHDR-400M Mino

🔥 15/100
← All projects
permittingCommercial

Perform code required 12-year hydrostatic test and recharge on (1) fire suppression cylinder: (1) Kiddie WHDR-400M Mino

SPX-144493

Hartford, Hartford County, Connecticut

Project ID
SPX-144493
Estimated value
$1,713
Square footage
Not reported
Opened / announced
Jan 24, 2025
Owner
Not reported
General contractor
Not reported
Architect
Not reported
Brands mentioned
None in public seed

Project overview

Hartford commercial permit MISC-MEC-24-000466 (Mechanical Permit): Perform code required 12-year hydrostatic test and recharge on (1) fire suppression cylinder: (1) Kiddie WHDR-400M Minor Re-pipe for the fire suppression system to ensure proper fire protection coverage over appliances Add (1) Nozzle to cover the Range properly. NFPA 17A: 7.5.1: The following parts of the wet chemical extinguishing systems shall be subjected to a hydrostatic pressure test at intervals not exceeding 12 years: 1) Wet chemical containers; 2) Auxiliary pressure containers; 3) Hose Assemblies NFPA 17A 6.4.1 General. It shall be verified that the appliances, hoods, and ducts are properly protected with nozzles and positioned in accordance with the manufacturer’s design, installation, and maintenance manual. 99 MAPLE AV, HARTFORD, CT 06114.

Key specs

  • Mechanical Permit
  • 99 MAPLE AV, HARTFORD, CT 06114
  • Permit MISC-MEC-24-000466

Still open for manufacturers

Active commercial building permit. Early product/spec window.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete
  • fire suppression

Timeline

  1. Permit issued

    Jan 24, 2025 · Prior research

Priority score

Low signal

15/100

Value
15/40
Recency
0/35
News coverage
0/25
📍 Regional location pending

Hartford, Hartford County, CT

Exact coordinates for this project haven't been geocoded yet.