VRF condensing units on the existing concrete pad oInstall a high efficiency VRF heat pump system (3) new Gree 14-tonn
🔥 25/100← All projects
permittingRetail
VRF condensing units on the existing concrete pad oInstall a high efficiency VRF heat pump system (3) new Gree 14-tonn
SPX-144253
Hartford, Hartford County, Connecticut
- Project ID
- SPX-144253
- Estimated value
- $225,015
- Square footage
- Not reported
- Opened / announced
- Jan 30, 2025
- Owner
- Not reported
- General contractor
- Not reported
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
Hartford commercial permit MISC-MEC-24-000524 (Mechanical Permit): VRF condensing units on the existing concrete pad oInstall a high efficiency VRF heat pump system (3) new Gree 14-tonn the right side of the building. (These will be set on the 9'x10' pad). Install (6) Gree 8-ton air handlers in the shop.. 760 WINDSOR ST, HARTFORD, CT 06120.
Key specs
- Mechanical Permit
- 760 WINDSOR ST, HARTFORD, CT 06120
- Permit MISC-MEC-24-000524
Still open for manufacturers
Active commercial building permit. Early product/spec window.
Manufacturer watch list
- glazing
- hvac
- roofing
- lighting
- doors and hardware
- fire suppression
Timeline
Permit issued
Jan 30, 2025 · Prior research
Priority score
Low signal25/100
- Value
- 25/40
- Recency
- 0/35
- News coverage
- 0/25
📍 Regional location pending
Hartford, Hartford County, CT
Exact coordinates for this project haven't been geocoded yet.