Replacement. Cut up, remove and recycle existing 275gl vertical oil tank and all related materials. Install two new Roth

🔥 19/100
← All projects
permittingCommercial

Replacement. Cut up, remove and recycle existing 275gl vertical oil tank and all related materials. Install two new Roth

SPX-143832

Hartford, Hartford County, Connecticut

Project ID
SPX-143832
Estimated value
$6,851
Square footage
Not reported
Opened / announced
Feb 11, 2025
Owner
Not reported
General contractor
Not reported
Architect
Not reported
Brands mentioned
None in public seed

Project overview

Hartford commercial permit MISC-MEC-25-000045 (Mechanical Permit): Replacement. Cut up, remove and recycle existing 275gl vertical oil tank and all related materials. Install two new Roth double wall 165gl vertical oil tanks, Model# DWT-620L. Each tank will be mounted on a 2-inch steel base where existing tank is located in the basement. Repipe each tank to outside with new 2-inch fill pipe and one common 2-in vent pipe, painted with anti-corrosive paint on the exterior of the house, fill and vent caps, tank gauges, and vent whistle. All new overhead 3/8 plastic coated copper oil line from new oil tanks to existing oil burner. Install tigerloop on boiler. *See contract for full scope of work. 371 BLUE HILLS AV, HARTFORD, CT 06112.

Key specs

  • Mechanical Permit
  • 371 BLUE HILLS AV, HARTFORD, CT 06112
  • Permit MISC-MEC-25-000045

Still open for manufacturers

Active commercial building permit. Early product/spec window.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete
  • fire suppression

Timeline

  1. Permit issued

    Feb 11, 2025 · Prior research

Priority score

Low signal

19/100

Value
18/40
Recency
1/35
News coverage
0/25
📍 Regional location pending

Hartford, Hartford County, CT

Exact coordinates for this project haven't been geocoded yet.