Replacement of one 10- ton A/C split air conditioning system serving the Sanctuary / Chapel area System #1 CARRIER AHU40
🔥 23/100Replacement of one 10- ton A/C split air conditioning system serving the Sanctuary / Chapel area System #1 CARRIER AHU40
SPX-139435
Hartford, Hartford County, Connecticut
- Project ID
- SPX-139435
- Estimated value
- $50,000
- Square footage
- Not reported
- Opened / announced
- Jun 4, 2025
- Owner
- Not reported
- General contractor
- Not reported
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
Hartford commercial permit MISC-MEC-25-000165 (Mechanical Permit): Replacement of one 10- ton A/C split air conditioning system serving the Sanctuary / Chapel area System #1 CARRIER AHU40RFAAAA25-UA0A0 / Model Condenser 38AUDT12A5-0A0A0, along with new installation of one CARRRIER 2 zone ductless heat pump system for the two from office areas. New Heat pump will be used for partial heating and full cooling. Existing heating system to remain in place. System #2- CARRIER (1) AHU 45MAHAQo9XA3 (1) AHU 45MAHAQ18XA3 - Model Heat Pump Condenser 37MGHAQ30EA3 Office areas have operable windows for ventilation air condensers mounted on roof Installation of of 10"duct from return ducting to one 8"x14" outside wall hood of the building for new fresh air requirements using (Offices/Conferences) listed under 403.3.1.1 of the IMC code book. People outdoor airflow Maximium people 120x 5 CFM 600CFM.. 640 FARMINGTON AV, HARTFORD, CT 06105.
Key specs
- Mechanical Permit
- 640 FARMINGTON AV, HARTFORD, CT 06105
- Permit MISC-MEC-25-000165
Still open for manufacturers
Active commercial building permit. Early product/spec window.
Manufacturer watch list
- glazing
- hvac
- elevators
- lighting
- flooring
- fire suppression
Timeline
Permit issued
Jun 4, 2025 · Prior research
Priority score
Low signal23/100
- Value
- 22/40
- Recency
- 1/35
- News coverage
- 0/25
Hartford, Hartford County, CT
Exact coordinates for this project haven't been geocoded yet.