* Remove & dispose of existing Weil McLain gas fired hot water boiler and controls. * Remove & dispose of indirect

🔥 22/100
← All projects
permittingCommercial

* Remove & dispose of existing Weil McLain gas fired hot water boiler and controls. * Remove & dispose of indirect

SPX-135170

Hartford, Hartford County, Connecticut

Project ID
SPX-135170
Estimated value
$17,317
Square footage
Not reported
Opened / announced
Sep 11, 2025
Owner
Not reported
General contractor
Not reported
Architect
Not reported
Brands mentioned
None in public seed

Project overview

Hartford commercial permit MISC-MEC-25-000335 (Mechanical Permit): * Remove & dispose of existing Weil McLain gas fired hot water boiler and controls. * Remove & dispose of indirect water heater, piping & controls. * Provide & install New Weil McLain Cga-6 gas boiler. * Install Crown MS2-075 Megastor. indirect water heater, piping & controls. * Provide & install three (3) heating circulators and (1) one circulator for indirect water heater. * Install Amtrol SX-30V expansion tank. * Reconnect new boiler to existing radiation, gas piping and electrical. * Connect boiler exhaust to existing chimney. * Reuse existing thermostats. * Drain and fill system as needed. * Includes: Permit, All labors, circulators, auto-feed, backflow preventor, low-water cut off and extrol tank.. 125 WESTERLY TER, HARTFORD, CT 06105.

Key specs

  • Mechanical Permit
  • 125 WESTERLY TER, HARTFORD, CT 06105
  • Permit MISC-MEC-25-000335

Still open for manufacturers

Active commercial building permit. Early product/spec window.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete
  • fire suppression

Timeline

  1. Permit issued

    Sep 11, 2025 · Prior research

Priority score

Low signal

22/100

Value
19/40
Recency
3/35
News coverage
0/25
📍 Regional location pending

Hartford, Hartford County, CT

Exact coordinates for this project haven't been geocoded yet.