Installation of a new 11,000 gallon aboveground storage tank (AST) and forwarding pump set / fueling system pumps, day t

🔥 41/100
← All projects
permittingCommercial

Installation of a new 11,000 gallon aboveground storage tank (AST) and forwarding pump set / fueling system pumps, day t

SPX-127092

Hartford, Hartford County, Connecticut

Project ID
SPX-127092
Estimated value
$204,550
Square footage
Not reported
Opened / announced
Apr 24, 2026
Owner
Not reported
General contractor
Not reported
Architect
Not reported
Brands mentioned
None in public seed

Project overview

Hartford commercial permit MISC-MEC-26-000141 (Mechanical Permit): Installation of a new 11,000 gallon aboveground storage tank (AST) and forwarding pump set / fueling system pumps, day tanks and piping to serve CCMC's emergency generators. New AST to be located at the bottom of the loading dock access of Seymour Street Extension. Prior to the tank installation, the project requires demolishing one small shed at the bottom of the loading dock ramp. FM REQUIRES A FINL FIRE INSPECTION.. 282 WASHINGTON ST, HARTFORD, CT 06106.

Key specs

  • Mechanical Permit
  • 282 WASHINGTON ST, HARTFORD, CT 06106
  • Permit MISC-MEC-26-000141

Still open for manufacturers

Active commercial building permit. Early product/spec window.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete
  • fire suppression

Timeline

  1. Permit issued

    Apr 24, 2026 · Prior research

Priority score

Watch

41/100

Value
24/40
Recency
17/35
News coverage
0/25
📍 Regional location pending

Hartford, Hartford County, CT

Exact coordinates for this project haven't been geocoded yet.