REPLACE BWV. INSTALL OVERFLOW SUMP PUMP WITH BATTERY BACKUP AS A BACKUP TO THE BWV. SUMP PUMP WILL DISCHARGE SOUTH OUT T

🔥 17/100
← All projects
permittingCommercial

REPLACE BWV. INSTALL OVERFLOW SUMP PUMP WITH BATTERY BACKUP AS A BACKUP TO THE BWV. SUMP PUMP WILL DISCHARGE SOUTH OUT T

SPX-146342

Hartford, Hartford County, Connecticut

Project ID
SPX-146342
Estimated value
$5,100
Square footage
Not reported
Opened / announced
Nov 26, 2024
Owner
Not reported
General contractor
Not reported
Architect
Not reported
Brands mentioned
None in public seed

Project overview

Hartford commercial permit MISC-PLM-24-000460 (Plumbing Permit): REPLACE BWV. INSTALL OVERFLOW SUMP PUMP WITH BATTERY BACKUP AS A BACKUP TO THE BWV. SUMP PUMP WILL DISCHARGE SOUTH OUT THROUGH THE FOUNDATION (SIDE YARD). INSTALL A 90 DEGREE FITTING AT THE END OF THE DISCHARGE PIPE SO THAT IT TERMINATES TOWARDS THE FRONT OF THE PROPERTY. ATTACH A 6' PIECE OF CORRAGATED PIPE AT THE END OF THE DISCHARGE ENSURING WATER WILL FLOW TOWARDS THE FRONT YARD. INSTALL A NEW 4 INCH CLEANOUT ON THE INTERIOR CAST IRON SEWER LINE NEAR THE BWV. (NO CCTV ACCESS AT ASSESSMENT) CLEANOUT NEEDS TO BE ADDED. RE-PLUMB THE WASHING MACHINE DRAIN LINES TO CODE AND INSTALL (1) CHECK VALVE FOR SURCHARGE PROTECTION. CUT AND SPLASH R/L #1 AND #2. WINDOW WELL DRAIN TIES INTO EXISTING FOOTING DRAIN. • Sump cannot discharge onto a driveway all other locations are to be installed not create a nuisance to adjacent properties. Front and any street side discharge of sump requires zoning approval.. 118 BANNISTER ST, HARTFORD, CT 06106. Hartford commercial permit MISC-PLM-25-000770 (Plumbing Permit): BWV/Sump pump. 186 BURNHAM ST, HARTFORD, CT 06112.

Key specs

  • Plumbing Permit
  • 118 BANNISTER ST, HARTFORD, CT 06106
  • Permit MISC-PLM-24-000460
  • 186 BURNHAM ST, HARTFORD, CT 06112
  • Permit MISC-PLM-25-000770

Still open for manufacturers

Active commercial building permit. Early product/spec window.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete
  • fire suppression

Timeline

  1. Permit issued

    Nov 26, 2024 · Prior research

Priority score

Low signal

17/100

Value
17/40
Recency
0/35
News coverage
0/25
📍 Regional location pending

Hartford, Hartford County, CT