REPLACE BWV AND INSTALL AN OVERFLOW SUMP PUMP WITH BATTERY BACKUP. SUMP PUMP WILL DISCHARGE OUT OF THE REAR OF THE FOUND
🔥 15/100REPLACE BWV AND INSTALL AN OVERFLOW SUMP PUMP WITH BATTERY BACKUP. SUMP PUMP WILL DISCHARGE OUT OF THE REAR OF THE FOUND
SPX-151395
Hartford, Hartford County, Connecticut
- Project ID
- SPX-151395
- Estimated value
- $2,000
- Square footage
- Not reported
- Opened / announced
- Aug 23, 2024
- Owner
- Not reported
- General contractor
- Not reported
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
Hartford commercial permit MISC-PLM-24-000690 (Plumbing Permit): REPLACE BWV AND INSTALL AN OVERFLOW SUMP PUMP WITH BATTERY BACKUP. SUMP PUMP WILL DISCHARGE OUT OF THE REAR OF THE FOUNDATION. EXTEND DISCHARGE 3-5' FROM THE BASE OF THE EXTERIOR FOUNDATION. OUTFLOW THE SUMP PUMP DISCHARGE INTO A 6' PIECE OF CORRIGATED PIPE. INSTALL (1) CHECK VALVE ON WASHING MACHINE PLUMBING LINES. PLUMB TO CODE IF NECESSARY. REPLACE EXISTING SLOP SINK WITH (1) NEW PVC SLOP SINK. RE-PLUMB DRAIN LINES TO CODE AND INSTALL (1) CHECK VALVE.THERE IS EVIDENCE OF FLOODING/WATER SEEPING THROUGH THE FOUNDATION. BASEMENT IS UNFINISHED. 51 CORNWALL ST, HARTFORD, CT 06112.
Key specs
- Plumbing Permit
- 51 CORNWALL ST, HARTFORD, CT 06112
- Permit MISC-PLM-24-000690
Still open for manufacturers
Active commercial building permit. Early product/spec window.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
- fire suppression
Timeline
Permit issued
Aug 23, 2024 · Prior research
Priority score
Low signal15/100
- Value
- 15/40
- Recency
- 0/35
- News coverage
- 0/25
Hartford, Hartford County, CT
Exact coordinates for this project haven't been geocoded yet.