Replace both BWV's with flush mounted box and lid. Install a NON perforated sump pump with battery backup, with electric

🔥 18/100
← All projects
permittingCommercial

Replace both BWV's with flush mounted box and lid. Install a NON perforated sump pump with battery backup, with electric

SPX-149928

Hartford, Hartford County, Connecticut

Project ID
SPX-149928
Estimated value
$8,100
Square footage
Not reported
Opened / announced
Sep 17, 2024
Owner
Not reported
General contractor
Not reported
Architect
Not reported
Brands mentioned
None in public seed

Project overview

Hartford commercial permit MISC-PLM-24-000694 (Plumbing Permit): Replace both BWV's with flush mounted box and lid. Install a NON perforated sump pump with battery backup, with electrical, with overflow to BWV and discharge out the rear of building. Replace the sink with a new PVC double bay with check valve. Install Hot/Cold water lines to the faucet. Directly above the sink, in the floor joist are two ball valves for the Hot/Cold water lines, please hook up both water lines to the new sink to make it functional. Customer has an upstairs sink that drains into the slop sink in basement, disconnect and re-route that pipe to be plumbed into the sanitary stack and bring to code. Disconnect and plug the two front R/Ls noted on sketch and extend to discharge away from house. Install a mechanical plug in R/L #1 only. 59 EATON ST, HARTFORD, CT 06114.

Key specs

  • Plumbing Permit
  • 59 EATON ST, HARTFORD, CT 06114
  • Permit MISC-PLM-24-000694

Still open for manufacturers

Active commercial building permit. Early product/spec window.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete
  • fire suppression

Timeline

  1. Permit issued

    Sep 17, 2024 · Prior research

Priority score

Low signal

18/100

Value
18/40
Recency
0/35
News coverage
0/25
📍 Regional location pending

Hartford, Hartford County, CT

Exact coordinates for this project haven't been geocoded yet.