Unit 1E, 2E, 3W, 1W: install bathtub, new shower valve, toilet tub and sink vanity to stay in the same place. Replace g
🔥 21/100Unit 1E, 2E, 3W, 1W: install bathtub, new shower valve, toilet tub and sink vanity to stay in the same place. Replace g
SPX-152509
Hartford, Hartford County, Connecticut
- Project ID
- SPX-152509
- Estimated value
- $30,000
- Square footage
- Not reported
- Opened / announced
- Aug 6, 2024
- Owner
- Not reported
- General contractor
- Not reported
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
Hartford commercial permit MISC-PLM-24-000701 (Plumbing Permit): Unit 1E, 2E, 3W, 1W: install bathtub, new shower valve, toilet tub and sink vanity to stay in the same place. Replace galvanized pipes with PVC. Cast iron to stay. Re-pipe water and drains for kitchen sink. All water in the bathroom will be piped in wall. Each unit will have its own dedicated waterline with a main shut off valve in the basement.. 74 KIBBE ST, HARTFORD, CT 06106.
Key specs
- Plumbing Permit
- 74 KIBBE ST, HARTFORD, CT 06106
- Permit MISC-PLM-24-000701
Still open for manufacturers
Active commercial building permit. Early product/spec window.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
- fire suppression
Timeline
Permit issued
Aug 6, 2024 · Prior research
Priority score
Low signal21/100
- Value
- 21/40
- Recency
- 0/35
- News coverage
- 0/25
Hartford, Hartford County, CT
Exact coordinates for this project haven't been geocoded yet.