Install non perforated sump pump as a battery back up to the backwater valve with overflow pipe connected to the BWV pit

🔥 16/100
← All projects
permittingCommercial

Install non perforated sump pump as a battery back up to the backwater valve with overflow pipe connected to the BWV pit

SPX-147972

Hartford, Hartford County, Connecticut

Project ID
SPX-147972
Estimated value
$3,600
Square footage
Not reported
Opened / announced
Oct 16, 2024
Owner
Not reported
General contractor
Not reported
Architect
Not reported
Brands mentioned
None in public seed

Project overview

Hartford commercial permit MISC-PLM-24-000904 (Plumbing Permit): Install non perforated sump pump as a battery back up to the backwater valve with overflow pipe connected to the BWV pit. Discharge out the rear. Rotate elbow towards the east and put 10' PVC extension on the end. Cut, remove and replace existing backwater valve in footing drain pit to a new PVC backwater valve. Replumb stand alone sink drain to code and install (1) 2in CV. the stack where the fixture ties into is galvanized steel. Re-plumb to code. Cut, plug and splash all 3 rain leaders. Coring through brink foundation will be required for pump discharge, this basement is unfinished.. 4 TREDEAU ST, HARTFORD, CT 06114.

Key specs

  • Plumbing Permit
  • 4 TREDEAU ST, HARTFORD, CT 06114
  • Permit MISC-PLM-24-000904

Still open for manufacturers

Active commercial building permit. Early product/spec window.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete
  • fire suppression

Timeline

  1. Permit issued

    Oct 16, 2024 · Prior research

Priority score

Low signal

16/100

Value
16/40
Recency
0/35
News coverage
0/25
📍 Regional location pending

Hartford, Hartford County, CT

Exact coordinates for this project haven't been geocoded yet.