Install non perforated sump pump as a battery back up to the backwater valve with overflow pipe connected to the BWV pit
🔥 16/100Install non perforated sump pump as a battery back up to the backwater valve with overflow pipe connected to the BWV pit
SPX-147972
Hartford, Hartford County, Connecticut
- Project ID
- SPX-147972
- Estimated value
- $3,600
- Square footage
- Not reported
- Opened / announced
- Oct 16, 2024
- Owner
- Not reported
- General contractor
- Not reported
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
Hartford commercial permit MISC-PLM-24-000904 (Plumbing Permit): Install non perforated sump pump as a battery back up to the backwater valve with overflow pipe connected to the BWV pit. Discharge out the rear. Rotate elbow towards the east and put 10' PVC extension on the end. Cut, remove and replace existing backwater valve in footing drain pit to a new PVC backwater valve. Replumb stand alone sink drain to code and install (1) 2in CV. the stack where the fixture ties into is galvanized steel. Re-plumb to code. Cut, plug and splash all 3 rain leaders. Coring through brink foundation will be required for pump discharge, this basement is unfinished.. 4 TREDEAU ST, HARTFORD, CT 06114.
Key specs
- Plumbing Permit
- 4 TREDEAU ST, HARTFORD, CT 06114
- Permit MISC-PLM-24-000904
Still open for manufacturers
Active commercial building permit. Early product/spec window.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
- fire suppression
Timeline
Permit issued
Oct 16, 2024 · Prior research
Priority score
Low signal16/100
- Value
- 16/40
- Recency
- 0/35
- News coverage
- 0/25
Hartford, Hartford County, CT
Exact coordinates for this project haven't been geocoded yet.