Install new sump pump in a NON PERFORATED pit as a backup to the BWV. See sketch and photos for discharge location Insta
🔥 15/100Install new sump pump in a NON PERFORATED pit as a backup to the BWV. See sketch and photos for discharge location Insta
SPX-141466
Hartford, Hartford County, Connecticut
- Project ID
- SPX-141466
- Estimated value
- $1,000
- Square footage
- Not reported
- Opened / announced
- Apr 11, 2025
- Owner
- Not reported
- General contractor
- Not reported
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
Hartford commercial permit MISC-PLM-25-000255 (Plumbing Permit): Install new sump pump in a NON PERFORATED pit as a backup to the BWV. See sketch and photos for discharge location Install new electrical subpanel to accommodate for GFCI receptacle. Replace existing BWV with new PVC BWV in a flush mounted irrigation style box with a lid. Install check valve on sink drain line. Plumb to code. Replace existing sink with new PVC double bay sink. A1 - Sump pump to discharge to north side of house (front side). This is the most feasible discharge location. Discharge piping to extend 6-inches or less from the exterior facade of building. ORIENT THE DISCHARGE SUCH THAT IT WILL NOT CREATE A PUBLIC NUISANCE.. 83 SIMPSON ST, HARTFORD, CT 06112.
Key specs
- Plumbing Permit
- 83 SIMPSON ST, HARTFORD, CT 06112
- Permit MISC-PLM-25-000255
Still open for manufacturers
Active commercial building permit. Early product/spec window.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
- fire suppression
Timeline
Permit issued
Apr 11, 2025 · Prior research
Priority score
Low signal15/100
- Value
- 14/40
- Recency
- 1/35
- News coverage
- 0/25
Hartford, Hartford County, CT
Exact coordinates for this project haven't been geocoded yet.