Rough in Phase 1. Install rough in valve for shower (18 inch tall tub). 2. Install new shower and tub spout drop ears (
🔥 18/100Rough in Phase 1. Install rough in valve for shower (18 inch tall tub). 2. Install new shower and tub spout drop ears (
SPX-137070
Hartford, Hartford County, Connecticut
- Project ID
- SPX-137070
- Estimated value
- $2,500
- Square footage
- Not reported
- Opened / announced
- Aug 1, 2025
- Owner
- Not reported
- General contractor
- Not reported
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
Hartford commercial permit MISC-PLM-25-000521 (Plumbing Permit): Rough in Phase 1. Install rough in valve for shower (18 inch tall tub). 2. Install new shower and tub spout drop ears (and setup for next phase of renovation). 3. Install all new angle stops on all applicable water lines. 4. Install a new rough in toilet waste line on 1st floor 5. Eliminate the basement toilet by capping off all the plumbing to it. 6. Eliminate the slop sink in basement and cap off all plumbing. 7. Install new 40 gallon electric water heater. 8. Set up plumbing for new cabinets and 2 new vanities. 9. Install valve for refrigerator water line. 10. Fix various leaks in basement and test. Finish Phase 1. Install new toilet flange on 1st floor. (and 2nd floor if needed) 2. Install and set 2 toilets. 3. Make all final connections for all water lines and drains. 4. Install 2 shower trim kits. 5. Install refrigerator water line.. 16 CAMBRIDGE ST, HARTFORD, CT 06120.
Key specs
- Plumbing Permit
- 16 CAMBRIDGE ST, HARTFORD, CT 06120
- Permit MISC-PLM-25-000521
Still open for manufacturers
Active commercial building permit. Early product/spec window.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
- fire suppression
Timeline
Permit issued
Aug 1, 2025 · Prior research
Priority score
Low signal18/100
- Value
- 16/40
- Recency
- 2/35
- News coverage
- 0/25
Hartford, Hartford County, CT
Exact coordinates for this project haven't been geocoded yet.