Replace all underground sewer lines and remove the basement concrete floor by saw-cutting from the front of the basement
🔥 46/100Replace all underground sewer lines and remove the basement concrete floor by saw-cutting from the front of the basement
SPX-124426
Hartford, Hartford County, Connecticut
- Project ID
- SPX-124426
- Estimated value
- $14,500
- Square footage
- Not reported
- Opened / announced
- Jun 22, 2026
- Owner
- Not reported
- General contractor
- Not reported
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
Hartford commercial permit MISC-PLM-26-000306 (Plumbing Permit): Replace all underground sewer lines and remove the basement concrete floor by saw-cutting from the front of the basement, adjacent to the backwater check valve, extending to the existing 4-inch cast-iron sewer stack and 2-inch laundry line stack. Cut and remove each existing stack at floor level. Excavate and remove all dirt as necessary to fully expose the work area. Remove and properly dispose of all concrete and excavated materials off-site. Install new 4-inch PVC underground sewer piping from the front of the house to the 2-inch laundry stack connection and the 4-inch main sewer stack connection. Install a 4-inch cleanout at each stack location and one additional center cleanout flush with the finished concrete floor. Backfill the trench with 3/4-inch crushed stone as required, then restore the concrete basement floor to match existing conditions.. 95 BALTIMORE ST, HARTFORD, CT 06112.
Key specs
- Plumbing Permit
- 95 BALTIMORE ST, HARTFORD, CT 06112
- Permit MISC-PLM-26-000306
Still open for manufacturers
Active commercial building permit. Early product/spec window.
Manufacturer watch list
- glazing
- hvac
- roofing
- lighting
- doors and hardware
- fire suppression
Timeline
Permit issued
Jun 22, 2026 · Prior research
Priority score
Watch46/100
- Value
- 19/40
- Recency
- 27/35
- News coverage
- 0/25
Hartford, Hartford County, CT
Exact coordinates for this project haven't been geocoded yet.