The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Nec

🔥 35/100
← All projects
completedCommercial

The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Nec

SPX-092388

, Florida

Project ID
SPX-092388
Estimated value
$50.1M
Square footage
Not reported
Opened / announced
Sep 27, 2023
Owner
Department of Veterans Affairs
General contractor
THE POVOLNY GROUP INC. SIGO VALIANT JV LLC. CDEEM CO. ADVON CORPORATION. AMERICAN VETERAN CONSTRUCTION CORP.
Architect
Not reported
Brands mentioned
None in public seed

Project overview

THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE COMPLETION OF THE EHRM INFRASTRUCTURE UPGRADES CONSTRUCTION PROJECT. Awarded by Department of Veterans Affairs. Period of performance through 2025-11-21. THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE CONSTRUCTION OF THE EHRM INFRASTRUCTURE UPGRADES CONSTRUCTION PROJECT. Awarded by Department of Veterans Affairs. Period of performance through 2027-08-29. CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE COMPLETION OF PROJECT 675-100 EXPAND PRIMARY CARE CONSTRUCTION ORLANDO VA MEDICAL CENTER - LAKE NONA. Awarded by Department of Veterans Affairs. Period of performance through 2026-10-05. THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE CONSTRUCTION OF THE SPECIALTY TREATMENT EXPANSION (MINOR) CONSTRUCTION PROJECT. Awarded by Department of Veterans Affairs. Period of performance through 2026-03-24. THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE COMPLETION OF THE CONSTRUCT DENTAL CENTER (MINOR) CONSTRUCTION PROJECT. Awarded by Department of Veterans Affairs. Period of performance through 2025-10-24. THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE COMPLETION OF THE EXPAND PRIMARY CARE MINOR CONSTRUCTION AT THE ORLANDO, FL LAKE NONA CAMPUS. Awarded by Department of Veterans Affairs. Period of performance through 2026-04-13.

Key specs

  • Award 36C77623C0149
  • Awarding agency: Department of Veterans Affairs
  • ZIP 33410
  • Award 36C77626C0019
  • ZIP 33744
  • Award 36C77624C0168
  • ZIP 32827
  • Award 36C77624C0009
  • ZIP 33612
  • Award 36C77623C0072
  • Award 36C77623C0109

Still open for manufacturers

Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only. Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete
  • medical gas
  • elevators
  • flooring
  • fire suppression

Timeline

  1. Awarded

    Sep 27, 2023 · Federal (SAM.gov / USAspending)

Priority score

Low signal

35/100

Value
35/40
Recency
0/35
News coverage
0/25
📍 Regional location pending

FL

Exact coordinates for this project haven't been geocoded yet.