Environmental Control System (Ecs) In High Bay Three (Hb-3) Of The Vehicle Assembly Building (Vab).

🔥 35/100
← All projects
completedCommercial

Environmental Control System (Ecs) In High Bay Three (Hb-3) Of The Vehicle Assembly Building (Vab).

SPX-095600

, Florida

Project ID
SPX-095600
Estimated value
$39.4M
Square footage
Not reported
Opened / announced
Apr 15, 2019
Owner
National Aeronautics and Space Administration
General contractor
HEALTHEON, INC
Architect
Not reported
Brands mentioned
None in public seed

Project overview

ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB). Awarded by National Aeronautics and Space Administration. Period of performance through 2026-04-30.

Key specs

  • Award 80KSC019C0007
  • Awarding agency: National Aeronautics and Space Administration
  • ZIP 32899

Still open for manufacturers

Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete

Timeline

  1. Awarded

    Apr 15, 2019 · Federal (SAM.gov / USAspending)

Priority score

Low signal

35/100

Value
35/40
Recency
0/35
News coverage
0/25
📍 Regional location pending

FL

Exact coordinates for this project haven't been geocoded yet.