Environmental Control System (Ecs) In High Bay Three (Hb-3) Of The Vehicle Assembly Building (Vab).
🔥 35/100← All projects
completedCommercial
Environmental Control System (Ecs) In High Bay Three (Hb-3) Of The Vehicle Assembly Building (Vab).
SPX-095600
, Florida
- Project ID
- SPX-095600
- Estimated value
- $39.4M
- Square footage
- Not reported
- Opened / announced
- Apr 15, 2019
- Owner
- National Aeronautics and Space Administration
- General contractor
- HEALTHEON, INC
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB). Awarded by National Aeronautics and Space Administration. Period of performance through 2026-04-30.
Key specs
- Award 80KSC019C0007
- Awarding agency: National Aeronautics and Space Administration
- ZIP 32899
Still open for manufacturers
Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
Timeline
Awarded
Apr 15, 2019 · Federal (SAM.gov / USAspending)
Priority score
Low signal35/100
- Value
- 35/40
- Recency
- 0/35
- News coverage
- 0/25
📍 Regional location pending
FL
Exact coordinates for this project haven't been geocoded yet.