Construction. Contractor Shall Provide All Labor, Equipment, And Materials To Install 3 Concrete Aba Rv Pads To Make Exi

🔥 23/100
← All projects
completedCommercial

Construction. Contractor Shall Provide All Labor, Equipment, And Materials To Install 3 Concrete Aba Rv Pads To Make Exi

SPX-090637

, Florida

Project ID
SPX-090637
Estimated value
$119,812
Square footage
Not reported
Opened / announced
Aug 1, 2024
Owner
Department of Defense
General contractor
MV7 INC
Architect
Not reported
Brands mentioned
None in public seed

Project overview

CONSTRUCTION. CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, AND MATERIALS TO INSTALL 3 CONCRETE ABA RV PADS TO MAKE EXISTING SITES ABA COMPLIANT. Awarded by Department of the Air Force (Department of Defense). Period of performance through 2024-10-01.

Key specs

  • Award FA252124F0312
  • Awarding agency: Department of the Air Force
  • ZIP 32925

Still open for manufacturers

Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete

Timeline

  1. Awarded

    Aug 1, 2024 · Federal (SAM.gov / USAspending)

Priority score

Low signal

23/100

Value
23/40
Recency
0/35
News coverage
0/25
📍 Regional location pending

FL

Exact coordinates for this project haven't been geocoded yet.