Highway 280 Asphalt Plant
🔥 0/100- Project ID
- SPX-001944
- Estimated value
- Not reported
- Square footage
- Not reported
- Opened / announced
- Aug 20, 2024
- Owner
- APAC-Atlantic, INC
- General contractor
- Not reported
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
Requested annexation and rezoning to industrial. Proposed asphalt plant, concrete plant, and redistribution yard. Project size as filed: asphalt plant: 9.1 acres, concrete plant: 3.3 acres. Estimated completion 2027. Filed as Georgia DRI #4265 on August 20, 2024, review status Completed.
Key specs
- asphalt plant: 9.1 acres, concrete plant: 3.3 acres
- Site: Highway 280, Parcel #016-015
Still open for manufacturers
Filed for regional review before construction, so product selections are not locked. Early design and specification window.
Manufacturer watch list
- process equipment
- concrete
- site civil
- conveyors
- switchgear
Timeline
Announced
Aug 20, 2024 · Georgia DRI (statewide)
Priority score
Low signal0/100
- Value
- 0/40
- Recency
- 0/35
- News coverage
- 0/25
📍 Regional location pending
Pembroke, Bryan County, GA
Exact coordinates for this project haven't been geocoded yet.