SOLARCYCLE EXPANSION
🔥 0/100- Project ID
- SPX-001809
- Estimated value
- Not reported
- Square footage
- Not reported
- Opened / announced
- Oct 31, 2024
- Owner
- SOLARCYCLE,INC.
- General contractor
- Not reported
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
SOLARCYCLE has acquired an existing building at 270 North Park Boulevard in Cedartown, adjacent to the new facility under construction at Cedartown North Business Park. The existing 255,000-square-foot building will be renovated to house the company’s solar panel recycling operations. Project size as filed: 255,000 square foot facility on 23.39 acres. Estimated completion Q2 2025. Filed as Georgia DRI #4319 on October 31, 2024, review status Completed.
Key specs
- 255,000 square foot facility on 23.39 acres
- Site: 270 North Park Boulevard (Parcel ID: 029-065G)
Still open for manufacturers
Filed for regional review before construction, so product selections are not locked. Early design and specification window.
Manufacturer watch list
- roofing
- hvac
- dock equipment
- concrete
- lighting
- fire suppression
- switchgear
- insulation
Timeline
Announced
Oct 31, 2024 · Georgia DRI (statewide)
Priority score
Low signal0/100
- Value
- 0/40
- Recency
- 0/35
- News coverage
- 0/25
Cedartown, Polk County, GA
Exact coordinates for this project haven't been geocoded yet.