Project overview
8 data center buildings (298,600+/- sq.ft. each for a total of 2,388,800 sq ft.), 3 proposed substation areas, storm water infrastructure, and internal access roads. Primary access is proposed to be from Amlajack Blvd. TRRC Note: updated 3.26.25. Project size as filed: 2,388,900 sq. ft. of total building floor area; 8 data center buildings (298,600 sq ft. each). Estimated completion Q3 2028. Filed as Georgia DRI #4374 on January 15, 2025, review status Completed.
Key specs
- 2,388,900 sq. ft. of total building floor area; 8 data center buildings (298,600 sq ft. each).
- Site: 33.43341224001632, -84.7360757345753. Parcels: 0965142001; 0965115001
Still open for manufacturers
Filed for regional review before construction, so product selections are not locked. Early design and specification window.
Manufacturer watch list
- roofing
- hvac
- dock equipment
- concrete
- lighting
- fire suppression
- switchgear
- insulation
Timeline
Announced
Jan 15, 2025 · Georgia DRI (statewide)
Priority score
Low signal0/100
- Value
- 0/40
- Recency
- 0/35
- News coverage
- 0/25
Coweta County, Coweta County, GA
Exact coordinates for this project haven't been geocoded yet.