Project Splice
🔥 1/100- Project ID
- SPX-001691
- Estimated value
- Not reported
- Square footage
- 2,100,000 SF
- Opened / announced
- Mar 6, 2025
- Owner
- Red Wolf DCD Properties LLC
- General contractor
- Not reported
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
Proposed project consists of a technology campus with multiple buildings, a substation and other utility improvements to serve the campus. Project size as filed: Seven buildings at 300,000 square feet each for total of 2,100,000 square feet. Estimated completion Phase 1 – 2029; Phase 2 – 2031; Phase 3 - 2033. Filed as Georgia DRI #4390 on March 06, 2025, review status Completed.
Key specs
- Seven buildings at 300,000 square feet each for total of 2,100,000 square feet
- Site: 31.971547°, -83.731085°
Still open for manufacturers
Filed for regional review before construction, so product selections are not locked. Early design and specification window.
Manufacturer watch list
- roofing
- hvac
- dock equipment
- concrete
- lighting
- fire suppression
- switchgear
- insulation
Timeline
Announced
Mar 6, 2025 · Georgia DRI (statewide)
Priority score
Low signal1/100
- Value
- 0/40
- Recency
- 1/35
- News coverage
- 0/25
📍 Regional location pending
Crisp County, Crisp County, GA
Exact coordinates for this project haven't been geocoded yet.