Project Splice

SPX-001691

Crisp County, Crisp County, Georgia

Project ID
SPX-001691
Estimated value
Not reported
Square footage
2,100,000 SF
Opened / announced
Mar 6, 2025
Owner
Red Wolf DCD Properties LLC
General contractor
Not reported
Architect
Not reported
Brands mentioned
None in public seed

Project overview

Proposed project consists of a technology campus with multiple buildings, a substation and other utility improvements to serve the campus. Project size as filed: Seven buildings at 300,000 square feet each for total of 2,100,000 square feet. Estimated completion Phase 1 – 2029; Phase 2 – 2031; Phase 3 - 2033. Filed as Georgia DRI #4390 on March 06, 2025, review status Completed.

Key specs

  • Seven buildings at 300,000 square feet each for total of 2,100,000 square feet
  • Site: 31.971547°, -83.731085°

Still open for manufacturers

Filed for regional review before construction, so product selections are not locked. Early design and specification window.

Manufacturer watch list

  • roofing
  • hvac
  • dock equipment
  • concrete
  • lighting
  • fire suppression
  • switchgear
  • insulation

Timeline

  1. Announced

    Mar 6, 2025 · Georgia DRI (statewide)

Priority score

Low signal