Project overview
This project is proposed to include six (6) 252K sq. ft. industrial buildings as well as an electrical substation and other utility improvements on seven (7) parcels that have a cumulative total of +/- 513 acres in support of a technology park / datacenter campus. Project size as filed: Six (6) industrial buildings with a cumulative floor area of 1,512,000 sq. ft. Estimated completion Phase 1 - 2028, Phase 2 - 2030; Phase 3 - 2033. Filed as Georgia DRI #4414 on March 07, 2025, review status Completed.
Key specs
- Six (6) industrial buildings with a cumulative floor area of 1,512,000 sq. ft.
- Site: 32.982620, -85.014525
Still open for manufacturers
Filed for regional review before construction, so product selections are not locked. Early design and specification window.
Manufacturer watch list
- roofing
- hvac
- dock equipment
- concrete
- lighting
- fire suppression
- switchgear
- insulation
Timeline
Announced
Mar 7, 2025 · Georgia DRI (statewide)
Priority score
Low signal1/100
- Value
- 0/40
- Recency
- 1/35
- News coverage
- 0/25
LaGrange, Troup County, GA