New Cold Storage Facility for PermaCold Logistics

🔥 1/100
← All projects
planningIndustrial

New Cold Storage Facility for PermaCold Logistics

SPX-001579

McIntosh County, McIntosh County, Georgia

Project ID
SPX-001579
Estimated value
Not reported
Square footage
210,805 SF
Opened / announced
Jun 4, 2025
Owner
TiCOLD Design Build
General contractor
Not reported
Architect
Not reported
Brands mentioned
None in public seed

Project overview

210,805 SF Cold Storage Distribution Facility. Facility includes Maintenance Area, Office Space, and Parking. Project size as filed: 210,805 SF. Estimated completion July 2026. Filed as Georgia DRI #4488 on June 04, 2025, review status Completed.

Key specs

  • 210,805 SF
  • Site: 12631 GA HWYY 251, Darien, GA 31305

Still open for manufacturers

Filed for regional review before construction, so product selections are not locked. Early design and specification window.

Manufacturer watch list

  • roofing
  • hvac
  • dock equipment
  • concrete
  • lighting
  • fire suppression
  • switchgear
  • insulation

Timeline

  1. Announced

    Jun 4, 2025 · Georgia DRI (statewide)

Priority score

Low signal

1/100

Value
0/40
Recency
1/35
News coverage
0/25
📍 Regional location pending

McIntosh County, McIntosh County, GA

Exact coordinates for this project haven't been geocoded yet.