New Cold Storage Facility for PermaCold Logistics
🔥 1/100← All projects
planningIndustrial
New Cold Storage Facility for PermaCold Logistics
SPX-001579
McIntosh County, McIntosh County, Georgia
- Project ID
- SPX-001579
- Estimated value
- Not reported
- Square footage
- 210,805 SF
- Opened / announced
- Jun 4, 2025
- Owner
- TiCOLD Design Build
- General contractor
- Not reported
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
210,805 SF Cold Storage Distribution Facility. Facility includes Maintenance Area, Office Space, and Parking. Project size as filed: 210,805 SF. Estimated completion July 2026. Filed as Georgia DRI #4488 on June 04, 2025, review status Completed.
Key specs
- 210,805 SF
- Site: 12631 GA HWYY 251, Darien, GA 31305
Still open for manufacturers
Filed for regional review before construction, so product selections are not locked. Early design and specification window.
Manufacturer watch list
- roofing
- hvac
- dock equipment
- concrete
- lighting
- fire suppression
- switchgear
- insulation
Timeline
Announced
Jun 4, 2025 · Georgia DRI (statewide)
Priority score
Low signal1/100
- Value
- 0/40
- Recency
- 1/35
- News coverage
- 0/25
📍 Regional location pending
McIntosh County, McIntosh County, GA
Exact coordinates for this project haven't been geocoded yet.