← All projects
planningData Center
75 South Data Center Campus
Project ID: ga-dri-4607-75-south-data-center-campus
Spalding County, Spalding County, Georgia
- Project ID
- ga-dri-4607-75-south-data-center-campus
- Estimated value
- Not reported
- Square footage
- 2,240,000 SF
- Opened / announced
- Jan 27, 2026
- Owner
- Industrial VI Enterprises, LLC c/o Steven L. Jones
- General contractor
- Not reported
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
Data Center Campus with 7, two-story buildings totaling 2,240,000 square feet. Project size as filed: 7, two-story buildings totaling 2,240,000 square feet. Estimated completion 2030. Filed as Georgia DRI #4607 on January 27, 2026, review status Completed.
Key specs
- 7, two-story buildings totaling 2,240,000 square feet
- Site: Land Lots 10 & 11, 2nd District Tax Parcel Numbers 214 01016B and 214 01016
Still open for manufacturers
Filed for regional review before construction, so product selections are not locked. Early design and specification window.
Manufacturer watch list
- switchgear
- generators
- cooling
- ups
- fire suppression
- structured cabling
- concrete