Project overview

Mass grading for Project JGK. Applicant is requesting only a Land Disturbance Permit (LDP) at this time. Project size as filed: Project is approximately 2,862 acres with approximately 1,100 acres disturbed with this land disturb. Estimated completion 2027 est.. Filed as Georgia DRI #4736 on May 05, 2026, review status Completed.

Key specs

  • Project is approximately 2,862 acres with approximately 1,100 acres disturbed with this land disturb
  • Site: 5140-5150 Catalyst Drive, off Appling Harlem Road, Interstate 20, and Morris Callaway Road

Still open for manufacturers

Filed for regional review before construction, so product selections are not locked. Early design and specification window.

Manufacturer watch list

  • switchgear
  • generators
  • cooling
  • ups
  • fire suppression
  • structured cabling
  • concrete