← All projects
planningIndustrial
OpenAI Project Camellia Data Center
Rincon, Effingham County, Georgia
- Estimated value
- $20B
- Square footage
- 4,400,000 SF
- Opened / announced
- —
- Owner
- OpenAI
- General contractor
- —
- Architect
- —
- Brands mentioned
- Georgia Power
Project overview
$20B+ data center campus at Savannah Gateway Industrial Hub near Savannah; up to ~4.4M SF across four buildings in DRI concept; phases 2028-2032; Georgia Power 3.2 GW agreement.
Key specs
- $20B+ campus
- Up to ~4.4M SF, four buildings
- Phases 2028-2032
- 3.2 GW Georgia Power agreement
Still open for manufacturers
Announced/in DRI review — multi-phase buildout through 2032 means prolonged specification and procurement windows for mission-critical products.
Manufacturer watch list
- data center cooling/mechanical
- electrical distribution and switchgear
- generators/UPS
- roofing
- precast concrete
- fencing and security
- fire suppression
Sources
- AJC coverage
- REBusinessOnline