Project Is To Upgrade The Existing Second Floor Of Building 115 To A Controlled Space At Moody Air Force Base, Georgia.
🔥 36/100← All projects
under constructionCommercial
Project Is To Upgrade The Existing Second Floor Of Building 115 To A Controlled Space At Moody Air Force Base, Georgia.
SPX-001218
, Georgia
- Project ID
- SPX-001218
- Estimated value
- $3.9M
- Square footage
- Not reported
- Opened / announced
- Dec 12, 2025
- Owner
- Department of Defense
- General contractor
- C&A - CORNERSTONE JV
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
PROJECT IS TO UPGRADE THE EXISTING SECOND FLOOR OF BUILDING 115 TO A CONTROLLED SPACE AT MOODY AIR FORCE BASE, GEORGIA. Awarded by Department of the Army (Department of Defense). Period of performance through 2027-08-13.
Key specs
- Award W912HN26CA009
- Awarding agency: Department of the Army
- ZIP 31699
Still open for manufacturers
Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
Timeline
Awarded
Dec 12, 2025 · Federal (SAM.gov / USAspending)
Priority score
Low signal36/100
- Value
- 30/40
- Recency
- 6/35
- News coverage
- 0/25
📍 Regional location pending
GA
Exact coordinates for this project haven't been geocoded yet.