The Contractor Shall Provide All Design Effort, Work, Planning, Labor, Materials, Equipment, Permits, Transportation And

🔥 29/100
← All projects
under constructionCommercial

The Contractor Shall Provide All Design Effort, Work, Planning, Labor, Materials, Equipment, Permits, Transportation And

SPX-089338

, Hawaii

Project ID
SPX-089338
Estimated value
$2.0M
Square footage
Not reported
Opened / announced
Sep 10, 2024
Owner
Department of Commerce
General contractor
EPC SERVICE INC
Architect
Not reported
Brands mentioned
None in public seed

Project overview

THE CONTRACTOR SHALL PROVIDE ALL DESIGN EFFORT, WORK, PLANNING, LABOR, MATERIALS, EQUIPMENT, PERMITS, TRANSPORTATION AND PERFORMANCE OF ALL OPERATIONS NECESSARY FOR POWER INFRASTRUCTURE AND SOLAR SYSTEM UPGRADE PROJECT AT THE MAUNA LOA ATMOSPHERIC BA. Awarded by National Oceanic and Atmospheric Administration (Department of Commerce). Period of performance through 2026-10-01.

Key specs

  • Award 1305M324C0067
  • Awarding agency: National Oceanic and Atmospheric Administration
  • ZIP 96720

Still open for manufacturers

Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete

Timeline

  1. Awarded

    Sep 10, 2024 · Federal (SAM.gov / USAspending)

Priority score

Low signal

29/100

Value
29/40
Recency
0/35
News coverage
0/25
📍 Regional location pending

HI

Exact coordinates for this project haven't been geocoded yet.