← All projects
planningIndustrial

DC BLOX Thunderbird Commerce Center — Indianapolis

Indianapolis, Marion County, Illinois

Estimated value
$1.8B
Square footage
80,000 SF
Opened / announced
Jul 1, 2026
Owner
DC BLOX
General contractor
Architect
Brands mentioned
DC BLOX

Project overview

$1.8–2B data center campus at 305 Fintail Drive. Phase 1: 80K SF building; Phase 2: 250K SF two-story. Plan filed July 2026.

Key specs

  • Phase 1: 80K SF one-story
  • Phase 2: 250K SF two-story
  • Existing 2.4-acre substation
  • 17 FTE at full buildout

Still open for manufacturers

Variance/replat pending — early MEP specs.

Manufacturer watch list

  • switchgear
  • cooling
  • generators
  • fire suppression
  • electrical