Construction Services To Re-Line 24-Inch Low Flow Pipe Between Stilling Basin Wall And Pumping Plant, Replace 24 Inch Kn

🔥 28/100
← All projects
under constructionCommercial

Construction Services To Re-Line 24-Inch Low Flow Pipe Between Stilling Basin Wall And Pumping Plant, Replace 24 Inch Kn

SPX-085711

, Kansas

Project ID
SPX-085711
Estimated value
$620,648
Square footage
Not reported
Opened / announced
Feb 20, 2025
Owner
Department of Defense
General contractor
FIRELAKE CONSTRUCTION INC
Architect
Not reported
Brands mentioned
None in public seed

Project overview

CONSTRUCTION SERVICES TO RE-LINE 24-INCH LOW FLOW PIPE BETWEEN STILLING BASIN WALL AND PUMPING PLANT, REPLACE 24 INCH KNIFE VALVE, AND KNIFE VALVE FLOOR STAND AT CLINTON DAM AND RESERVOIR, LAWRENCE, KANSAS. Awarded by Department of the Army (Department of Defense). Period of performance through 2026-08-27.

Key specs

  • Award W912DQ25CA002
  • Awarding agency: Department of the Army
  • ZIP 66049

Still open for manufacturers

Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete

Timeline

  1. Awarded

    Feb 20, 2025 · Federal (SAM.gov / USAspending)