This Requirement Is For The Milling And Repaving Asphalt Parking Lot, Full Depth Patching, Repairing Sections Of Concret

🔥 30/100
← All projects
under constructionCommercial

This Requirement Is For The Milling And Repaving Asphalt Parking Lot, Full Depth Patching, Repairing Sections Of Concret

SPX-080461

, Maryland

Project ID
SPX-080461
Estimated value
$785,619
Square footage
Not reported
Opened / announced
Oct 10, 2025
Owner
Department of Defense
General contractor
SMNC SOLUTIONS-AMES1 JOINT VENTURE, LLC
Architect
Not reported
Brands mentioned
None in public seed

Project overview

THIS REQUIREMENT IS FOR THE MILLING AND REPAVING ASPHALT PARKING LOT, FULL DEPTH PATCHING, REPAIRING SECTIONS OF CONCRETE CURB, GUTTER, AND SIDEWALK IAW STATEMENTS OF WORK (SEE ATTACHMENTS IN SECTION J) AT B1840 AND B3198 AT JB ANDREWS. Awarded by Department of the Air Force (Department of Defense). Period of performance through 2026-10-17.

Key specs

  • Award FA286025C0026
  • Awarding agency: Department of the Air Force
  • ZIP 20762

Still open for manufacturers

Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete

Timeline

  1. Awarded

    Oct 10, 2025 · Federal (SAM.gov / USAspending)

Priority score

Low signal

30/100

Value
27/40
Recency
3/35
News coverage
0/25
📍 Regional location pending

MD

Exact coordinates for this project haven't been geocoded yet.