This Requirement Is For The Milling And Repaving Asphalt Parking Lot, Full Depth Patching, Repairing Sections Of Concret
🔥 30/100This Requirement Is For The Milling And Repaving Asphalt Parking Lot, Full Depth Patching, Repairing Sections Of Concret
SPX-080461
, Maryland
- Project ID
- SPX-080461
- Estimated value
- $785,619
- Square footage
- Not reported
- Opened / announced
- Oct 10, 2025
- Owner
- Department of Defense
- General contractor
- SMNC SOLUTIONS-AMES1 JOINT VENTURE, LLC
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
THIS REQUIREMENT IS FOR THE MILLING AND REPAVING ASPHALT PARKING LOT, FULL DEPTH PATCHING, REPAIRING SECTIONS OF CONCRETE CURB, GUTTER, AND SIDEWALK IAW STATEMENTS OF WORK (SEE ATTACHMENTS IN SECTION J) AT B1840 AND B3198 AT JB ANDREWS. Awarded by Department of the Air Force (Department of Defense). Period of performance through 2026-10-17.
Key specs
- Award FA286025C0026
- Awarding agency: Department of the Air Force
- ZIP 20762
Still open for manufacturers
Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
Timeline
Awarded
Oct 10, 2025 · Federal (SAM.gov / USAspending)
Priority score
Low signal30/100
- Value
- 27/40
- Recency
- 3/35
- News coverage
- 0/25
MD
Exact coordinates for this project haven't been geocoded yet.