Reclaim Water Expansion Phase Ii - Installing Utility Mains, Laterals, Controls And Interconnect Within 8 Existing Build

🔥 34/100
← All projects
under constructionCommercial

Reclaim Water Expansion Phase Ii - Installing Utility Mains, Laterals, Controls And Interconnect Within 8 Existing Build

SPX-084621

, Maryland

Project ID
SPX-084621
Estimated value
$18.7M
Square footage
Not reported
Opened / announced
Apr 20, 2025
Owner
Department of Defense
General contractor
GRUNLEY CONSTRUCTION CO., INC.
Architect
Not reported
Brands mentioned
None in public seed

Project overview

RECLAIM WATER EXPANSION PHASE II - INSTALLING UTILITY MAINS, LATERALS, CONTROLS AND INTERCONNECT WITHIN 8 EXISTING BUILDINGS TO EXTEND SERVICE TO 8 LEGACY BUILDINGS ON CAMPUS TO REPLACE POTABLE WATER WITH RECLAIMED WATER FOR COOLING TOWER MAKEUP. Awarded by Department of the Army (Department of Defense). Period of performance through 2027-07-08.

Key specs

  • Award W912DR25FA019
  • Awarding agency: Department of the Army
  • ZIP 20755

Still open for manufacturers

Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete

Timeline

  1. Awarded

    Apr 20, 2025 · Federal (SAM.gov / USAspending)

Priority score

Low signal

34/100

Value
33/40
Recency
1/35
News coverage
0/25
📍 Regional location pending

MD

Exact coordinates for this project haven't been geocoded yet.